Project Overview

Ecotone Systems has successfully completed the Duct Installation and 50 mm Acoustic Foam Fixing in a Semi Anechoic Chamber for Epavo Electricals Pvt Ltd at their Bhiwadi facility. This project was executed with a strong focus on acoustic precision, airflow control, and structural integrity to ensure that the chamber delivers reliable and accurate testing performance. Semi Anechoic Chambers require careful integration of mechanical and acoustic elements, and this installation was carried out with strict adherence to quality and performance standards.

Client Profile – Epavo Electricals Pvt Ltd

Epavo Electricals Pvt Ltd operates in the electrical manufacturing sector where accurate acoustic testing environments are essential for product validation and performance analysis. To support their testing infrastructure, the company required a properly treated Semi Anechoic Chamber that maintains controlled sound conditions while allowing necessary ventilation and airflow. Ecotone Systems was entrusted with executing the duct installation and acoustic foam fixing to enhance the chamber’s functionality and performance reliability.

Duct Installation in Semi Anechoic Chamber

The duct installation within a Semi Anechoic Chamber demands careful planning to prevent sound leakage, vibration transmission, and airflow noise that could affect test accuracy. Ecotone Systems designed and installed the duct system to ensure smooth airflow management while maintaining the acoustic integrity of the chamber. Special attention was given to minimizing structural vibration transfer and maintaining proper alignment within the chamber’s construction framework. The installed ducting supports operational efficiency without compromising acoustic performance.

50 mm Acoustic Foam Fixing

As part of the acoustic treatment, 50 mm high-performance acoustic foam was installed to enhance sound absorption and reduce unwanted reflections within the chamber. The foam thickness was selected to effectively manage mid and high-frequency sound absorption, improving the overall acoustic behavior of the Semi Anechoic Chamber. Proper bonding techniques and precise alignment were ensured during installation to maintain durability, uniform coverage, and long-term acoustic stability. This treatment significantly contributes to achieving controlled reverberation and accurate testing conditions.

Importance of Precision in Semi Anechoic Chamber Installations

A Semi Anechoic Chamber is engineered to simulate free-field conditions for acoustic measurements, and even minor installation inaccuracies can affect performance results. Proper duct integration and correct acoustic lining are critical to maintaining low background noise levels and consistent frequency response. Through detailed execution and quality control, Ecotone Systems ensured that both mechanical and acoustic components function cohesively to support dependable testing operations.

Project Location – Bhiwadi

The project was completed at the Epavo Electricals Pvt Ltd facility in Bhiwadi, Rajasthan. All work was carried out following professional safety standards and technical guidelines to ensure seamless project delivery within the committed timeline.

Ecotone Systems – Expertise in Acoustic Solutions

Ecotone Systems specializes in the design, manufacturing, and installation of Semi Anechoic Chambers, Reverberation Chambers, and advanced acoustic testing environments. Our team combines technical expertise with practical execution to deliver high-performance solutions tailored to industrial and research requirements. The successful completion of this project further strengthens our commitment to precision-driven acoustic installations.

Duct Installation & 50 mm Foam Fixing in Semi Anechoic Chamber – Project Update